<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=434362350639616&amp;ev=PageView&amp;noscript=1">

Design-led Construction is a Game Changer for U.S. Tori Contracting

Background 

U.S. Las Vegas-based Tori Contracting has been building luxury accommodations since 2015, at which time they invested in their first FRAMECAD System.  Their work building wall panels and trusses and joists soon expanded to include commercial and institutional projects as well as residential offerings across Nevada. Tori’s smaller, cohesive structure results in superior workmanship and economical solutions. 

Topics: Case Studies, Benefits of Cold Formed Steel Construction, Residential

Fast Growth for Australian True Blue Steel Frames

Background

Recent requirement changes around flood and bushfire zones mean that timber can no longer be used for these projects. With the additional benefit of speed of construction being a major factor when it comes to winning contracts in the Australian construction market cold formed steel (CFS) framing is the obvious choice.

Topics: Case Studies

Frame Up Now Say Steel Will Replace Wood in the Next 15 Years

Background

Having gained a reputation for reducing construction time and cost for mid-rise structures, steel frames, joists and trusses are at the forefront of residential construction in the USA.  Arizona-based Frame Up Now is providing cold formed steel (CFS) framing kits to the Do-It-Yourself residential market. 

Topics: Case Studies, Residential

Speedhouse Group Reduces Labor Force 50% & Increases Productivity 300%

Background 

Serving the construction industry since 1974, ​​Speedhouse Group has grown steadily from 50 to 2000 employees to date. They switched their offering from timber to steel framing in 2010 by investing in their first x2 FRAMECAD systems.  Speedhouse Group’s focus is mainly providing developers with prefabricated and modular solutions, spanning across the Middle East and North Africa. 

Topics: Case Studies

Award Win for Australian Based Dynamic Steel Frame for LGS Project

Background 

The construction industry across Australia is currently experiencing a substantial transformation.  Clients demand more reliable product supply with less labor costs, so the move from timber to steel framing is gaining momentum.  This change gave the opportunity of further expansion for well-established Melbourne based Dynamic Steel Frame, who have been manufacturing light gauge steel (LGS) frames for the commercial and domestic industry since 2012.   

Topics: Case Studies

Discover how the need for the rapid construction of quality buildings is defining the future of construction
New Call-to-action
New Call-to-action
Download our CFS roof trusses mini-guide

Recent Posts

Recommended

Assisted Living Project - Intellisteel 3-level assisted living project fabricated and assembled in only 13.5 weeks, by the Intellisteel group
Hyatt Place - Douglass Colony FRAMECAD by Douglass Colony: Hyatt Place Westminster, USA
CFS: A dream for residential construction CFS: A dream for residential construction projects

Subscribe to FRAMECAD News - The Framework