<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=434362350639616&amp;ev=PageView&amp;noscript=1">

SBS GROUP DELIVER COST EFFICIENT ENGINEERING & PREFABRICATED FRAMES FOR THE LANGDON APARTMENTS


 

Having made the switch to FRAMECAD’s automated construction system in April 2016; prefabricated steel framing experts SBS Group have used their FRAMECAD system to make significant savings for their customers whilst delivering an accelerated construction process. The Langdon Apartments are one of their recent examples of providing an exceptional service for their customers

From their purpose-built manufacturing facility in Chirnside Park, Melbourne Australia; SBS Group have become well known for their apartment and town house projects. The following projects have shown how using the design-led methodology, the team of talented engineers and detailers at SBS have been able to improve the design and deliver a premium result.

The Langdon Apartments in New South Wales are a great example of how SBS Group's experience and expertise has delivered an amazing result for a challenging site and design. View the Case Study below and discover how SBS Group can provide the tools to help developers Build Smarter.

Contact us today to learn more about the Way the World Constructs 

Discover how the need for the rapid construction of quality buildings is defining the future of construction

Topics: Case Studies, Offsite & Modular Construction, Benefits of Cold Formed Steel Construction

New Call-to-action
New Call-to-action
Download our CFS roof trusses mini-guide

Recent Posts

Recommended

Assisted Living Project - Intellisteel 3-level assisted living project fabricated and assembled in only 13.5 weeks, by the Intellisteel group
Hyatt Place - Douglass Colony FRAMECAD by Douglass Colony: Hyatt Place Westminster, USA
CFS: A dream for residential construction CFS: A dream for residential construction projects

Subscribe to FRAMECAD News - The Framework