<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=434362350639616&amp;ev=PageView&amp;noscript=1">

FRAMECAD Supports US Navy in Rapid Construction

LGS-System-Trial

Click here to read our latest case study to find out how FRAMECAD is supporting this important work. The US Navy have been doing some important exploratory work into the benefits that cold formed steel systems can provide for rapid, humanitarian housing.

Discover how the need for the rapid construction of quality buildings is defining the future of construction

Topics: Case Studies

New Call-to-action
New Call-to-action
Download our CFS roof trusses mini-guide

Recent Posts

Recommended

Assisted Living Project - Intellisteel 3-level assisted living project fabricated and assembled in only 13.5 weeks, by the Intellisteel group
Hyatt Place - Douglass Colony FRAMECAD by Douglass Colony: Hyatt Place Westminster, USA
CFS: A dream for residential construction CFS: A dream for residential construction projects

Subscribe to FRAMECAD News - The Framework